New construction roofing Fort Thomas KY built right the first time

New build roofing for Fort Thomas builders, homeowners and general contractors

If you are framing a house, adding an addition or replacing a roof on a newly purchased property, new construction roofing Fort Thomas KY is the phase that protects everything underneath it. We install complete roof systems for new builds across Campbell County, from decking and ice and water shield to ridge vents and final flashing. Our new build roofing Fort Thomas crews work directly with your builder's schedule, so the roof is dried in before the drywall goes up.

Modern two-story house under construction with visible scaffolding and building materials.

What new construction roofing Fort Thomas KY actually involves

New construction roofing Fort Thomas KY is the full assembly of a roof on a building that has never been covered before, from the roof deck up through shingles, flashing and ventilation. It is not a repair and it is not a tear-off. We start with the sheathing, nail down synthetic underlayment and ice and water shield at the eaves and valleys, then set the drip edge, flashing and ridge vents before the first shingle goes on. Every layer has to be right, because nobody sees it again for 25 years.

Most of our Fort Thomas new build work comes from three situations: a builder closing in a house before winter, a homeowner adding a garage or second-story addition, and a buyer who purchased a lot and is starting from scratch. Campbell County sits in a freeze-thaw band where ice dams form on north-facing slopes, so we spec ice and water shield higher than the state minimum. If you have been searching for new construction roofing in Fort Thomas KY near me, that local detail is exactly what separates a roof that lasts from one that leaks in year three.

Why builders and homeowners choose our new build roofing Fort Thomas crews

Why builders and homeowners choose our new build roofing Fort Thomas crews

A new roof is the one part of a build you cannot easily go back and fix. We install it once, to manufacturer spec, with the paperwork that keeps the warranty valid.

Dry-in on schedule

Framing crews, electricians and drywallers all depend on a dried-in roof. We schedule new construction roofing services Fort Thomas around your build calendar and typically complete a standard 2,000 sq ft ranch dry-in in one to two days, so the trades behind us never sit idle.

Warranty-valid installation

GAF, Owens Corning and CertainTeed all require specific nailing patterns, underlayment and ventilation to honor their shingle warranties. We install to those specs and hand you the documentation. That matters when a homeowner sells the house in year eight and the buyer's inspector starts asking questions.

Built for Kentucky freeze-thaw

Fort Thomas roofs see repeated freeze-thaw cycles from November through March. We run ice and water shield a minimum of 24 inches past the interior wall line at eaves and valleys, which is stricter than what most production builders install and the single biggest defense against ice dams.

One crew, deck to ridge

We handle sheathing, underlayment, flashing, ventilation and shingle or metal installation with the same crew. No handoffs between subcontractors, no finger-pointing if a valley leaks. You get one point of contact from the first nail to the final magnetic sweep for stray roofing nails.

How our new construction roofing process works

New construction roofing runs on someone else's clock. Here is how we keep our part of the build on time and inspection-ready.

1

Plan review

We start with your building plans, roof pitch, square footage and the shingle or metal system you have chosen. We confirm ventilation ratios, ice and water shield placement and flashing details before anyone sets foot on the deck. This takes about 30 minutes and catches problems while they are still on paper.

2

Deck inspection

Once the framer is done, we walk the sheathing for soft spots, gaps wider than 1/8 inch and nail pops. We re-nail or replace panels as needed, because underlayment over a bad deck is money wasted. On a typical Fort Thomas build this inspection takes one to two hours.

3

Dry-in and underlayment

We install synthetic underlayment across the field, ice and water shield at eaves, valleys and penetrations, then drip edge and flashing. This is the stage that gets your build weather-tight. A 2,000 sq ft roof is usually dried in within a single working day.

4

Final roof installation

Shingles, metal panels, ridge vents and pipe boots go on next. We use a roofing nail gun set to the manufacturer's depth, hand-nail where the gun cannot reach, and cut shingles with a shingle cutter for clean hips and valleys. Most full installs take two to four days depending on roof complexity.

5

Inspection and cleanup

We run a magnetic sweeper across the yard and driveway, pull all staging, and walk the roof with your builder or inspector. You get photos of every layer, the manufacturer warranty paperwork and a final sign-off. The whole closeout takes about an hour.

New construction roofing expertise you can verify

VividMend has been installing roofs in Northern Kentucky since 2022, and new construction is one of the few jobs where every layer is inspected before it disappears. Our installers hold OSHA 10 and OSHA 30 cards, and we are an NRCA member and BBB accredited business. We install GAF, Owens Corning Duration, CertainTeed, IKO, Malarkey, Atlas Roofing and Tamko systems, and we keep current with the manufacturer bulletins that change nailing patterns and ventilation requirements. Fort Thomas builders keep calling us because we read the plans, show up when we say we will, and leave a roof that passes inspection the first time.

  • OSHA 10 and OSHA 30 certified installers on every new construction crew
  • GAF Master Elite and Owens Corning Preferred Contractor credentials
  • CertainTeed SELECT ShingleMaster for shingle warranty coverage
  • NRCA member and BBB accredited, licensed under Kentucky roofing license requirements
  • Hundreds of squares installed across Campbell County since 2022
New construction roofing expertise you can verify

Why Fort Thomas picks our new construction roofing services

Builders do not have time for a roofer who disappears mid-job. Homeowners do not want a roof that fails the first hard winter. We built our new construction division around both problems.

We work your schedule

When your framer finishes on a Tuesday, we want to be on the deck Wednesday. We coordinate directly with general contractors and homeowners, and we keep a two-crew buffer during peak building season so a weather delay on one job does not push yours back a week.

Manufacturer-backed systems

We install GAF Timberline, Owens Corning Duration, CertainTeed and metal roofing panels as complete systems, not mixed parts. That means the underlayment, flashing and ventilation all come from the same warranty family, which is what manufacturers require when a claim is filed.

Local code knowledge

Campbell County and Fort Thomas have their own inspection expectations for sheathing attachment, ice and water shield and ventilation. Our new construction roofing contractor Fort Thomas KY team has walked those inspections enough times to know what the inspector looks for before he climbs the ladder.

Clean, safe job sites

We stage materials off the driveway, use ladder stabilizers and safety harnesses on every pitch, and run a magnetic sweeper at the end of each day. Builders notice. So do homeowners whose kids play in the yard after the crew leaves.

What our new construction roofing package includes

Every new build roof we install covers the full assembly from the deck up. If your project needs something outside this scope, like structural framing changes or a full tear-off of an existing roof, we price that separately and tell you before we start.

What's Included

Decking and sheathing check

We inspect every panel for soft spots, gaps and nail pops, then re-nail or replace as needed. A solid deck is the foundation of the whole roof, and skipping this step is the most common shortcut we see on production builds.

Underlayment and ice shield

Synthetic underlayment goes across the field, with ice and water shield at eaves, valleys, ridges and penetrations. In Fort Thomas we run the ice shield at least 24 inches past the interior wall line, which is stricter than the state minimum.

Flashing and ventilation

Drip edge, step flashing, valley flashing and pipe boots are installed to manufacturer spec. We balance intake and exhaust ventilation so the attic does not trap moisture, which is what causes premature shingle failure and ice dams.

Finished roof surface

We install your chosen shingle, metal panel, clay tile or slate tile system using a roofing nail gun set to the correct depth and hand-nailing where needed. Ridge caps, hip lines and valleys are cut clean with a shingle cutter.

Final inspection and cleanup

We walk the roof with you or your builder, photograph every layer for your records, and run a magnetic sweeper across the yard. You get the manufacturer warranty paperwork and a roof that is ready for the next trade.

Problems our new construction roofing in Fort Thomas KY solves

New construction roofs fail for predictable reasons. Here are the ones we see most often on Fort Thomas builds and how we prevent them.

Problem

Underlayment installed over a wet or uneven deck

Trapped moisture rots sheathing from the inside, and the shingles above it telegraph every bump. By the time you notice, the decking has to come off.

Solution

We inspect and re-nail the deck before any underlayment goes down, and we do not install over wet sheathing. If rain hits mid-stage, we tarp and wait rather than trap water under the roof.

Problem

Missing ice and water shield at eaves and valleys

Fort Thomas freeze-thaw cycles push meltwater under shingles at the eaves. Ice dams form, water backs up into the attic, and you are looking at stained ceilings by February.

Solution

We run ice and water shield a minimum of 24 inches past the interior wall line at every eave and valley. It costs a little more in materials and it is the single detail that prevents ice dam damage.

Problem

Poor attic ventilation on a new build

Without balanced intake and exhaust, attic heat and moisture cook the shingles from below. Manufacturer warranties get voided, and shingle life drops by years.

Solution

We calculate ventilation ratios from your roof square footage and install ridge vents and intake vents sized to match. We document the math so the manufacturer warranty stays valid.

Problem

Flashing failures at chimneys and pipe boots

These are the number one source of roof leaks on new homes. A single failed pipe boot can send water down a wall cavity before anyone notices a stain.

Solution

We install new pipe boots, step flashing and counterflashing at every penetration, then hose-test the details before the final inspection. Nothing gets covered up until it passes.

When Fort Thomas clients call us for new construction roofing

1

A builder is closing in a new house before the first hard freeze and needs the roof dried in this week.

Solution:

We review the plans, confirm the underlayment and ice shield spec, and schedule dry-in for the day after framing finishes. A 2,000 sq ft roof is usually dried in within one working day.

Outcome:

The build stays on schedule, the trades behind us keep moving, and the framing and insulation stay dry through the winter.

2

A homeowner is adding a second-story addition over an existing garage in the Highlands.

Solution:

We tie the new roof into the existing structure, match the shingle profile, and install proper flashing at the transition. Ice and water shield goes in at the new valley and along the wall line.

Outcome:

The addition looks original from the street, the tie-in does not leak, and the existing roof warranty is not disturbed.

3

A buyer purchased a lot in South Fort Thomas and is building from scratch with a metal roof spec.

Solution:

We install standing seam metal roofing panels over synthetic underlayment, detail the thermal movement at every clip, and coordinate with the framer on load and fastener placement.

Outcome:

A 40 to 70 year roof that sheds snow, handles freeze-thaw, and comes with the manufacturer's warranty paperwork on closing day.

4

A general contractor needs a new construction roofer near me Fort Thomas who can handle four lots in the same subdivision.

Solution:

We stage materials across the lots, run two crews in sequence, and keep a single point of contact for scheduling. Each roof gets the same deck inspection, dry-in and final walk-through.

Outcome:

Four roofs completed on a rolling schedule, all inspections passed, and no gaps where a trade was waiting on the roofer.

Tools and methods behind our new construction roofs

Tools & Equipment

Roofing nail gun

Drives shingle nails to the exact manufacturer depth. We set the regulator per shingle brand, because too deep cuts the mat and voids the warranty.

Shingle cutter

Cuts clean hips, valleys and ridge caps without tearing the shingle mat. Clean cuts matter on visible roof planes where a ragged edge shows from the ground.

Pitch hoist

Lifts shingle bundles and metal panels onto steep roofs safely. It keeps our crew off ladders with heavy loads and speeds up material staging.

Ladder stabilizer and safety harness

Every installer on a new construction roof wears a harness, and we set ladder stabilizers on every access point. OSHA compliance is not optional on our sites.

Caulking gun

Applies sealant at pipe boots, step flashing and ridge details. We use manufacturer-approved sealants so the detail does not dry out and crack in year three.

Magnetic sweeper

Runs across the yard and driveway at the end of every workday to pick up stray roofing nails. On a new build with kids nearby, this is not a nice-to-have.

Methods

Manufacturer-spec installation

We install GAF, Owens Corning Duration, CertainTeed, IKO, Malarkey, Atlas Roofing and Tamko systems to the written instructions that keep their warranties valid. Nailing patterns, underlayment type and ventilation ratios all follow the spec sheet, not habit.

Three-point inspection

We inspect the roof at three stages: after decking, after dry-in and after final installation. Each stage gets photographed, and nothing gets covered until the previous stage passes. This is how we catch flashing and ventilation issues before they are buried.

Ice and water shield placement

At every eave, valley, ridge and penetration we run ice and water shield a minimum of 24 inches past the interior wall line. That exceeds the Kentucky minimum and is our standard response to Fort Thomas freeze-thaw cycles.

Ventilation balancing

We calculate intake and exhaust ventilation from the attic square footage and install ridge vents and intake vents sized to match. Balanced ventilation protects the shingles from below and keeps attic moisture from rotting the deck.

How new construction roofing runs in Fort Thomas specifically

Fort Thomas sits on a ridge above the Ohio River, and that geography drives everything about how we build roofs here. The north-facing slopes in the Highlands and along Tower Park hold snow longer, so ice and water shield placement matters more than it does ten miles inland. Summer humidity runs high enough that we never install shingles over a deck that has not fully dried, because trapped moisture shows up as premature shingle failure within a few years. Campbell County inspections are thorough on sheathing attachment and ventilation, and we plan for that from the first deck inspection. We also work around the reality that many Fort Thomas lots are tight, with mature trees close to the house and limited staging space. That means we stage materials in the driveway, use a pitch hoist instead of a crane where we can, and run a magnetic sweeper daily so tree limbs and nails do not end up in the lawn. If you are looking for new construction roofing in Fort Thomas KY reviews before you commit, ask any local builder who has used us on a new build. We have been installing roofs here since 2022 and we know what this climate does to a roof that was built to the minimum.

Service Areas

Fort Thomas Highlands

Steep grades and mature tree canopy mean more debris in valleys and more shade on north slopes. We spec ice and water shield higher here and clear valleys carefully before final inspection.

Downtown Fort Thomas

Tighter lots and older street trees limit staging space. We stage materials in the driveway and use a pitch hoist rather than a crane on most new builds in this area.

Tower Park

Elevation and wind exposure are higher near the park. We check fastener patterns and ridge cap attachment carefully on roofs in this area because wind uplift is a real concern.

South Fort Thomas

Newer subdivisions with consistent roof pitches make scheduling predictable. We can often run two crews in sequence across multiple lots in the same week.

Local Considerations

Freeze-thaw cycles from November through March

Meltwater refreezes at eaves and forms ice dams. We run ice and water shield a minimum of 24 inches past the interior wall line to keep water from backing up under the shingles.

Summer humidity above 70 percent

Decks stay damp longer after rain. We do not install underlayment or shingles over wet sheathing, because trapped moisture rots the deck from the inside.

Mature tree canopy across older neighborhoods

Tree limbs drop debris into valleys and shade north slopes. We clear valleys at final inspection and recommend a fall maintenance check each year to keep drainage clear.

Steep grades on Highlands and Tower Park lots

Staging space is limited and ladder access is harder. We plan material staging and use pitch hoists and harnesses to keep the crew safe and the schedule on track.

New build dried in before a December freeze

Before

A builder in South Fort Thomas had framing finished in late November with a 2,400 sq ft roof deck exposed and a hard freeze forecast within ten days. No underlayment, no flashing, and the drywall crew was already scheduled.

After

We inspected the deck, re-nailed 14 panels, and dried in the entire roof in a single day. Shingles went on two days later. The drywall crew started on schedule and the build closed in before the freeze.

Maintenance & Follow-up

We recommend a fall inspection each year to clear valleys and confirm ridge vents are clear before the first freeze. The manufacturer warranty stays valid with documented annual checks.

Before

A homeowner adding a second story over a garage in the Highlands needed a standing seam metal roof on a 10/12 pitch. Two prior quotes wanted to sub the metal work out, and neither mentioned thermal movement details.

After

We installed standing seam panels over synthetic underlayment with clips detailed for thermal movement, matched the existing shingle profile at the tie-in, and hose-tested the valley. The addition passed inspection first time.

Maintenance & Follow-up

Metal roofs need an annual check of fastener torque and a clear gutter line. We recommend clearing tree debris from the panels each fall to prevent standing water at the seams.

Before

A general contractor in Bellevue had four lots framed within three weeks of each other and needed roofs dried in sequentially without gaps between trades. One roofer had already backed out mid-project.

After

We ran two crews in sequence, dried in each roof within one day of framing, and completed all four roofs in 11 working days. All four inspections passed, and the drywall crews never waited.

Maintenance & Follow-up

For multi-lot builds we set up a single annual maintenance visit covering all four roofs, which keeps the manufacturer warranties current and catches small flashing issues early.

Frequently asked questions about new construction roofing in Fort Thomas

Have questions? We have answers.

Call Us
How much does new construction roofing cost in Fort Thomas KY?

Most new construction roofs in Fort Thomas run $6.50 to $11.00 per square foot installed in 2026, which puts a typical 2,000 sq ft asphalt shingle roof between $13,000 and $22,000. Metal roofing panels push that to $18,000 to $38,000. Pitch, roof complexity, decking repairs and whether you choose GAF Timberline or a premium CertainTeed line all move the number. We price the whole system, not just the shingles.

How long does new construction roofing take in Fort Thomas?

A standard new build roof takes two to four working days from deck inspection to final cleanup. Dry-in, which is the underlayment and flashing stage, usually happens in a single day so your other trades can keep moving. Larger homes, steep pitches, slate tiles or clay tiles add time. Weather is the biggest variable, and we build a one to two day buffer into every schedule between November and March.

Do you offer new construction roofing in Fort Thomas Kentucky?

Yes. We install new construction roofing across Fort Thomas and the surrounding Campbell County communities, including Downtown Fort Thomas, Midway, Tower Park, South Fort Thomas, North Fort Thomas and Bellevue. We work with builders, general contractors and homeowners building on their own lot. Call (844) 799-4703 and we can usually walk your plans within a few days.

What is the best roofing for new construction in Fort Thomas KY?

Architectural asphalt shingles from GAF, Owens Corning Duration or CertainTeed are the best value for most Fort Thomas new builds, offering 30 to 50 year warranties at a moderate cost. Metal roofing panels last 40 to 70 years and handle freeze-thaw cycles well. Slate tiles and clay tiles are the longest-lived but heaviest and most expensive. We match the system to your pitch, budget and how long you plan to own the house.

Credentials and reviews behind our Fort Thomas roofing work

Certifications

GAF Master Elite by GAF
Owens Corning Preferred Contractor by Owens Corning
CertainTeed SELECT ShingleMaster by CertainTeed
OSHA 10 and OSHA 30 certified installers by Occupational Safety and Health Administration
NRCA member and BBB accredited business by National Roofing Contractors Association and Better Business Bureau

Reviews

Google

VividMend installed the roof on our new build in Fort Thomas and the whole process was straightforward. They inspected the deck, found two soft panels our framer missed, and had the roof dried in the same day. The final walk-through with photos of every layer was more documentation than I expected.

BBB

We used them for new construction roofing on a metal roof spec and they handled the standing seam panels themselves instead of subbing it out. Thermal movement details were done right, and the warranty paperwork was in my hands the day they finished.

Google

Our addition in the Highlands needed a roof tie-in and they matched the existing shingles so well you cannot tell where the old roof ends. They ran a magnetic sweeper every day because our kids play in the yard. Small thing, but it says a lot.

Related roofing services for Fort Thomas new builds

Roofing contractor near me

If you are searching for a roofing contractor near me while your build is underway, we are based in Fort Thomas and can be on your site the same week. We handle the full roof scope so your general contractor does not have to coordinate a second trade.

Roofing contractor near me

24/7 roofing service

New builds are not immune to storms. If a wind event peels back underlayment or a tarp blows off before shingles go on, our 24/7 roofing service gets a crew out to re-secure the dry-in and prevent water damage to framing and insulation.

24/7 roofing service

Local roofing contractor

As a local roofing contractor working Campbell County, we know the inspectors, the lumber yards and the weather patterns. That local knowledge shortens the learning curve on every new construction roof and keeps your build on schedule.

Local roofing contractor

Emergency roofing service

A partially built roof is vulnerable. Our emergency roofing service responds when a storm hits mid-build, secures the deck with tarps and temporary underlayment, and documents the damage so your insurance claim is straightforward.

Emergency roofing service

Roof repair

Even new roofs occasionally need a roof repair, usually from a dropped tool, a missed nail or a pipe boot that was not sealed. We come back, fix it and match the existing shingle so the repair is invisible from the ground.

Roof repair

Roof Replacement

If you bought a lot with an older structure that will be torn down to the studs, a roof replacement may be part of the project. We handle tear-off, decking replacement and full re-roof alongside your new construction schedule.

Roof Replacement

Roof Installation

Roof installation is the core of new construction work. We install sheathing, underlayment, flashing, ventilation and the finished roof surface as one continuous scope, so nothing falls between trades.

Roof Installation

Roof Maintenence

Once your new build is occupied, roof maintenence keeps the warranty valid. We recommend a fall inspection each year to clear valleys, check pipe boots and confirm ridge vents are clear before the first freeze.

Roof Maintenence

Residential Roofing

Most new construction in Fort Thomas is residential roofing. We install shingle, metal and tile systems on single-family homes, garages, additions and accessory dwelling units, all to manufacturer spec.

Residential Roofing

Commercial Roofing

Commercial roofing for new builds uses different systems, often TPO or modified bitumen on low-slope decks. We install those assemblies with the same attention to flashing and drainage details that keeps flat roofs from ponding.

Commercial Roofing

Metal roof installation

Metal roof installation is a strong choice for new builds in Fort Thomas because standing seam panels shed snow and handle freeze-thaw better than shingles. We install concealed-fastener systems with proper underlayment and thermal movement details.

Metal roof installation

Asphalt shingle roofing

Asphalt shingle roofing remains the most common new construction choice in Campbell County. We install GAF Timberline, Owens Corning Duration and CertainTeed lines with the ventilation and ice and water shield those warranties require.

Asphalt shingle roofing

Tile roof replacement

Tile roof replacement is heavier work and requires a deck framed for the load. On new builds we coordinate with your framer early so the structural design supports clay tiles or concrete tiles without a change order later.

Tile roof replacement

Slate roofing

Slate roofing is the longest-lived option for a new build and suits the historic character of some Fort Thomas neighborhoods. We install it with copper flashing and proper underlayment, and we plan the weight with your structural engineer.

Slate roofing

Shingle roof repair

If a shingle roof repair is needed shortly after your build, it is usually a wind-lifted tab or a nail that backed out. We match the original shingle and re-seal the area so the repair does not stand out.

Shingle roof repair

Storm damage roof repair

Storm damage roof repair on a new build often means re-securing underlayment and flashing before the finish roof goes on. We document everything with photos so your builder's insurance and yours are both covered.

Storm damage roof repair

Roof inspection services

Roof inspection services are built into our new construction process at three points: after decking, after dry-in and after final installation. You get photos of each stage, which is useful documentation when you sell the home.

Roof inspection services

Leaky roof fix

A leaky roof fix on a new build usually traces back to a flashing failure at a valley, chimney or pipe boot. We find the entry point with a hose test and repair the detail rather than patching shingles over the problem.

Leaky roof fix

Flat roof repair

Flat roof repair matters on additions and garages with low-slope sections. Ponding water on flat roofs is the main enemy, so we verify slope and drainage before the membrane goes down on any new build.

Flat roof repair

Industrial Roofing

Industrial roofing projects follow the same principles at a larger scale. We install structural metal panels and standing seam systems on new commercial and industrial buildings throughout the Fort Thomas area.

Industrial Roofing

affordable roofing

Affordable roofing does not mean cutting underlayment or skipping ice and water shield. We keep new build costs down by ordering materials accurately, scheduling tightly and avoiding the callbacks that come from rushed work.

affordable roofing

Best roofing contractor

The best roofing contractor on a new build is the one who shows up when the framer finishes. We hold GAF Master Elite and Owens Corning Preferred credentials and a BBB accreditation, and we let the finished roof make the argument.

Best roofing contractor

roofing contractors in my area

If you have been searching roofing contractors in my area while planning a Fort Thomas build, we are local to Campbell County and can meet you on site. We bring plan review, material takeoffs and a schedule that fits your build.

roofing contractors in my area

roofing specialist

A roofing specialist for new construction reads plans, understands ventilation math and knows which manufacturer systems pair with which underlayment. That is the level of detail we bring to every new build roof.

roofing specialist

roof waterproofing

Roof waterproofing on a new build starts with ice and water shield at eaves, valleys and penetrations, then synthetic underlayment across the field. Getting those layers right is what keeps water out during the years before the shingles age.

roof waterproofing

industrial roofing contractors

Industrial roofing contractors work with metal, TPO and modified bitumen systems on large decks. We bring that same commercial discipline to residential new builds, especially when a home has complex valleys or multiple roof planes.

industrial roofing contractors

professional roofing services

Professional roofing services on a new construction project means permits, manufacturer specs, safety compliance and cleanup handled without you chasing anyone. We carry OSHA certifications and install to written manufacturer instructions.

professional roofing services

roofing installers

Our roofing installers are trained on roofing nail guns, shingle cutters and pitch hoists, and they wear safety harnesses on every pitch. That training shows up in straight ridge lines and valleys that drain the way they should.

roofing installers

steel roofing contractors

Steel roofing contractors install standing seam and exposed-fastener panels that handle Fort Thomas winters well. We detail thermal movement, fastener placement and underlayment so the panels do not oil-can or loosen over time.

steel roofing contractors

Get your new construction roofing Fort Thomas KY quote

We are a licensed, insured and BBB accredited roofing company serving Fort Thomas and Campbell County since 2022. Send us your plans or your address and we will walk the site, confirm the roof system and give you a written price. Call (844) 799-4703 today.